000 | 00966cab a22002055a 4500 | ||
---|---|---|---|
001 | L149299 | ||
008 | e2010 xxk 000 0 eng d | ||
035 | _a(Sirsi) u149299 | ||
041 | 0 | _aeng | |
100 | 1 | _aHealey, Bill | |
245 | 0 | 0 |
_aNot your average prefab _bthe use of off-site manufacture (OSM) _h[electronic resource] |
260 | _c2010 | ||
490 |
_aConstruction Journal _vFeb-Mar 2010, 13-15(3) |
||
520 | _aThe use of factory-made material components to assemble buildings on site can be an attractive commercial and project proposition because of the potential benefits of faster construction on site, predictable project time and cost, assured quality and accuracy, and minimisation of waste. | ||
590 | _aKA | ||
651 | 4 |
_aUnited Kingdom _y |
|
690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
856 | 4 | 8 |
_uhttps://www.rics.org/site/download_feed.aspx?fileID=5762&fileExtension=PDF _zView this item (member-only access) at www.rics.org |
942 | _n0 | ||
999 |
_c82118 _d82118 |