000 01046cam a2200253 4500
001 ABS62412
008 000000n2000 000 0 eng u
035 _a(Sirsi) u107052
100 _aMarsh, C.
245 _aWhole life costing
260 _c2000
490 _aBuilding Services Journal
_v July 2000, 32-33(2)
520 _aConsiders the weakest area of building services to be whole life costing, and discusses whether engineers, with their understanding of service costs can change attitudes within the property industry. Egan recommendations that design needs to encompass whole life costs have been accepted by government and incorporated into the Treasury's latest "Guidance Notes". Also looks at the MoD Prime Contracting procurement initiative.
590 _aABS
650 _aWHOLE-LIFE COSTING
650 _aEGAN REFORMS
650 _aSERVICE COSTS
650 _aBEST PRACTICE
650 _aDESIGN
650 _aENGINEERS
650 _aLIFE-CYCLE COSTING
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c64018
_d64018