Your search returned 6 results.

Sort
Results
1.
Delay and disruption in construction contracts. by
Edition: 2nd ed.
Publication details: London LLP 2000
Availability: Items available for loan: London (2)Collection, call number: SHELF 205, ...
2.
Analyzing the impact of change orders on a schedule by Series: Cost Engineering ; 40(9) September 1998, 33-39(7)Language: English
Publication details: 1998
Availability: Items available for loan: London (1)Collection, call number: ABS59374.
3.
The proof of excusable delay in building contracts without `as-built` records by Series: Construction Law Journal ; 13(4) 1997, 243-252(10)Language: English
Publication details: 1997
Availability: Items available for loan: London (1)Collection, call number: ABS57236.
4.
A case of control over contract completion by Series: Contract Journal ; 375(5997) 20 October 1994, 14(1)Language: English
Publication details: 1994
Availability: Items available for loan: London (1)Collection, call number: ABS51489.
5.
Getting the job done by Series: Chartered Quantity Surveyor ; 14(2) October 1991, 14-15(2)Language: English
Publication details: 1991
Availability: Items available for loan: London (1)Collection, call number: X1147.
6.
Getting the job done by Series: Chartered Quantity Surveyor ; 14(2) October 1991, 14-15(2)Language: English
Publication details: 1991
Availability: Items available for loan: London (1)Collection, call number: X1663.
Pages