Won't pay? Must pay

By: Series: Building Services Journal ; December 2000, 43(1)Publication details: 2000Subject(s): Summary: Discusses the recent case of "Whiteways Contractors (Sussex) Ltd v Impresa Castelli Construction UK Ltd" where Impresa (I) refused to pay compensation after a second arbitration also decided in Whiteway (W)'s favour. The issue was over the fact that a paying party does not have to serve a notice to withhold if the basis for withholding payment is that the work provided has been defective - in this case W had not installed some fittings for which it had been paid and had applied an excessive mark-up. As a result of this case, any one in a similar situation should issue a notice of withholding, within the time limit set out in the Housing Grants, Construction and Regeneration Act 1996; while anyone in W's position can use this case to cast considerable doubt on the argument that the abatement does not require notice.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Journal article London Journal article ABS63296 (Browse shelf(Opens below)) 1 Available 110315-1001

Discusses the recent case of "Whiteways Contractors (Sussex) Ltd v Impresa Castelli Construction UK Ltd" where Impresa (I) refused to pay compensation after a second arbitration also decided in Whiteway (W)'s favour. The issue was over the fact that a paying party does not have to serve a notice to withhold if the basis for withholding payment is that the work provided has been defective - in this case W had not installed some fittings for which it had been paid and had applied an excessive mark-up. As a result of this case, any one in a similar situation should issue a notice of withholding, within the time limit set out in the Housing Grants, Construction and Regeneration Act 1996; while anyone in W's position can use this case to cast considerable doubt on the argument that the abatement does not require notice.