Image from Google Jackets

Using a weighted score model as an aid to selecting procurement methods for small building works

By: Contributor(s): Language: English Series: Construction Management & Economics ; 15(4) 1997, 341-348(9)Publication details: 1997Subject(s): Summary: Focuses on the selection of procurement methods for small building works and proposes the use of a weighted score model as an aid to selecting a method. References.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Journal article London Journal article ABS57237 (Browse shelf(Opens below)) 1 Available 79469-1001

Focuses on the selection of procurement methods for small building works and proposes the use of a weighted score model as an aid to selecting a method. References.