Image from Google Jackets

Updating the electricity generating stations and overhead lines inquiry procedure in England and Wales an energy review consultation

By: Language: English Publication details: London DTI 2006Subject(s): LOC classification:
  • 711.1 $2 18
Online resources: Summary: Details the proposed rules update to the procedures for inquiries under the Electricity Act 1989 s62, in order to determine applications under s36 to construct large electricity generating stations and under s37 for overhead lines. The procedures take account of existing best practice introduced in the Town and Country Planning (Major Infrastructure Inquiries Procedure) (England) Rules 2005 and take advantage of powers created in the Energy Act 2004. The new rules will replace the existing Electricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1990. Consultation deadline is 1 February 2007.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Book Virtual Online ONLINE PUBLICATION (Browse shelf(Opens below)) 1 Available 135725-2001

Details the proposed rules update to the procedures for inquiries under the Electricity Act 1989 s62, in order to determine applications under s36 to construct large electricity generating stations and under s37 for overhead lines. The procedures take account of existing best practice introduced in the Town and Country Planning (Major Infrastructure Inquiries Procedure) (England) Rules 2005 and take advantage of powers created in the Energy Act 2004. The new rules will replace the existing Electricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1990. Consultation deadline is 1 February 2007.